CommercialFire Stop Insulation
Commercial Fit-out Passive Fire, Msheireb
Msheireb, Doha
The Challenge
A commercial fit-out breached fire compartmentation as new services passed through rated walls and floors.
Our Solution
We surveyed every penetration and reinstated compartmentation with tested fire-stop systems, documenting each seal for inspection.
The Outcome
Compartmentation was fully restored and certified, giving the client an auditable passive fire protection record for Civil Defence.
More projects
- ResidentialResidential Tower Fire Protection, Al SaddComplete fire protection fit-out for a residential tower — detection, sprinklers and pumps, designed and certified to QCDD.
- CommercialCommercial Office HVAC, West BayChilled-water HVAC and fresh-air systems for a commercial office, engineered for comfort and energy efficiency.
- WarehouseWarehouse Leak Detection, Industrial AreaNon-destructive leak survey that pinpointed a hidden fire-main leak sapping system pressure.